Technical Memorandums
This page includes links to technical memoranda created for the SRWA. Please click the links below to review these documents.
Water Supply Alternatives (2/19/2019)Operations Technology Preliminary Design (1/07/2019)Summary of Life Cycle Cost Analysis Tool (1/07/2019)Manganese Removal Bench-Test Results Nov 2018 (11/15/2018)Preliminary Design of Replacement Bridge at Aldrich Road and TID Ceres Main Canal (10/30/2018)Bench Test Results - Seasonal Ozone Demand (9/18/2018)Raw Water System Surge Analysis (8/02/2018)Finished Water System Surge Analysis (8/02/2018)Draft Pre-design of the SRWA Water Treatment Plant (7/11/2018)Preliminary Design of SRWA Raw Water Pump Station (7/05/2018)Source Water Quality Assessment (3/20/2018)Addendum to Cost Comparison TM (11/27/2017)Project Definition at Conclusion of Phase 1 (11/08/2017)Bench Test Results (10/18/2017)Treatment Process Alternatives 2 (7/07/2017)Allocation of Surface Water Supply Project Costs (11/10/2016)Historical Water Quality Assessment (8/22/2016)Public Outreach Plan (8/22/2016)Transmission Pipeline Low Flow Velocities (8/22/2016)Treatment Process Alternatives (8/22/2016)Water Quality Sampling Plan (8/22/2016)Funding Strategy (8/11/2016)Pipeline Alignment (8/11/2016)Prelim Phasing and Plant Sizing (8/11/2016)Treatment Performance Goals (8/11/2016)