Click the months below to filter through construction photos.
December

Flocculation Sedimentation building

Outfall Structure

Outfall Structure

Work underway at the Flocculation Sedimentation Building

Water storage tank after completion of shotcrete application

Outfall Structure excavation.

Prepping for concrete placement at the Flocculation Sedimentation building







November

Drying Beds

Cables wrapped around the water storage tank

Shotcrete application at the water storage tank

Concrete placement at Flocculation Sedimentation building

Liner prep at drying beds

Hydro Blasting Clear Well tank.

Rebar at the Flocculation Sedimentation building

Water storage tank wrapping machine

Flocculation Sedimentation upper mat rebar installation

Back Wash equalization basin










October

Work underway at the Water Storage Tank

Forms being installed at the Backwash Equalization Basin

Flocculation Sedimentation piping in the drying beds

2nd Concrete placement at Backwash EQ Walls.




September

The first concrete placement of the water storage tank dome was completed on 9/27

The first wall pour at the Backwash Equalization Basin was recently completed.

Reinforcing bar is being placed on the northwest side of the water storage tank dome

Water storage tank dome reinforcement

The contractor continues to excavate and install 12” unthickened sludge lines for the drying beds.

The contractor continues to erect scaffolding to support the dome on the inside of the water storage tank






August

DN Tanks continues to install form work for the underside of the Dome.

The contractor is installing falsework for the underside of the water storage tank dome.

The contractor is continuing to erect dome shoring on floor slab of the water storage tank.

Contractor continuing to erect dome shoring on floor slab.

The Contractor continues to erect shoring for the concrete water storage tank roof.

Wall installation underway for the Water Storage Tank






July

Wall installation underway for the Water Storage Tank

Concrete walls being installed in the Water Storage Tank

Wall installation underway for the Water Storage Tank

Continued wall pours for the water storage tank




June

Initial Water Storage Tank concrete wall placement.

Contractor installing wall forms for the water storage tank.

The contractor is placing reinforcing bar and wall forms at the Backwash Equalization Basin.

Pre-manufactured steel wall forms are being placed at the water storage tank.




May

Placing and compacting base rock at the Backwash Equalization Basin

The contractor is placing and compacting base rock for the water storage tank

The contractor is placing and compacting base rock for the filter backwash basin

Reinforcing steel is being installed on one half of the storage tank floor in advance of a 500 cubic yard concrete pour this week.

The contractor is placing and compacting base rock for the water storage tank

Placing rock over the geo fabric at the water treatment plant

Placing rock over the geo fabric at the water treatment plant

Aerial view of the work underway at the Water Treatment Plant

Aerial view of the work underway at the Water Treatment Plant

Aerial image of work at the Water Treatment Plant

Aerial image of work at the Water Treatment Plant

Aerial view of the work underway at the Water Treatment Plant

Aerial view of the work underway at the Water Treatment Plant













April

Forms for for the concrete barriers on the Aldrich Rd bridge

Forms for for the concrete barriers on the Aldrich Rd bridge

Mass excavation underway at the Water Treatment Plant.

Mass excavation underway at the Water Treatment Plant.

Mass excavation underway at the Water Treatment Plant.

Geo fabric being placed as a first step to constructing a 5 million gallon water reservoir

Forms for for the concrete barriers on the Aldrich Rd bridge

Aldrich Road bridge concrete barrier pour

Aerial view of the construction at Aldrich Road Bridge









March

Building formwork on the Aldrich Road Bridge

Form work on the sides of the Aldrich Road Bridge

Form work on the sides of the Aldrich Road Bridge

Mass excavation at the Water Treatment Plant site

The tension bars extend from the side of the girders at the Aldrich Road Bridge

Tension bars extend from the side of the Aldrich Road Bridge

A closer look at the tension bar extending from the girders on the Aldrich Road Bridge

A paddle wheel scraper works at the Water Treatment Plant site. These are used to move the material being excavated.

Mass excavation at the Water Treatment Plant site

Grouting at the Aldrich Road Bridge Replacement Project.

Grouting at the Aldrich Road Bridge Replacement Project.

Mass excavation underway at the Water Treatment Plant site.

Mass excavation underway at the Water Treatment Plant Site

Mass excavation underway at the Water Treatment Plant site

Mass excavation at the Water Treatment Plant site

Girder placement at the Aldrich Road Bridge Replacement Project.

Girder placement at the Aldrich Road Bridge Replacement Project

Girder placement at the Aldrich Road Replacement Project

Site clearing is underway at the Water Treatment Plant site

New foundations being installed at the Aldrich Road Bridge Replacement Project

Work is under way at the Aldrich Road Bridge Replacement Project